پیام فرستادن
Dongguan Haide Machinery Co., Ltd
Dongguan Haide Machinery Co., Ltd
محصولات
خونه /

محصولات

CE Approved 10 Ton Airbag Dock Leveler For Loading / Unloading Cargo

جزئیات محصول

Place of Origin: China

نام تجاری: Haide

گواهی: CE/ISO

Model Number: HD-QDT-10

شرایط پرداخت و حمل و نقل

Minimum Order Quantity: 1 Set

قیمت: Negotiation(EXW,FOB or CIF price)

Packaging Details: film,and put it directly to container.

Delivery Time: 15 days

Supply Ability: 100 sets per month

بهترین قیمت رو بدست بیار
حالا تماس بگیرید
مشخصات
برجسته:

hydraulic dock leveller,mobile dock leveller

,

mobile dock leveller

Platform Width:
1830mm
Platform Length:
2290mm
Height:
490mm
Dynamic Capacity:
10 Ton
Adjust Range:
+300mm/-300mm
Main Deck Thickness:
8mm
Lip Board Thickness:
16mm
Power Pack:
USA "Ametek" 190~240V 1P
Platform Width:
1830mm
Platform Length:
2290mm
Height:
490mm
Dynamic Capacity:
10 Ton
Adjust Range:
+300mm/-300mm
Main Deck Thickness:
8mm
Lip Board Thickness:
16mm
Power Pack:
USA "Ametek" 190~240V 1P
توضیحات
CE Approved 10 Ton Airbag Dock Leveler For Loading / Unloading Cargo

CE Approved 10 Ton Airbag Dock Leveler For Loading / Unloading Cargo
 
 
Description:
Equipment Specification(W*L*H): 1830mm*2290mm*490mm
Pit Dimension(W*L*H): 1870mm*2280mm*500mm
Dynamic Capacity: 10 ton
Adjust range: +300mm/-300mm
Main deck thickness: 8mm
Lip board thickness: 16mm
Power pack: : American "Ametek"


Color: Main body Red+Safety Black&Orange
Color: Optional
Warranty: 365 days after installation for all, 5 years warranty for the steel structure.
1 We can manufacture the dock ramp with capacity 10ton up to 25ton.
2 We can manufacture it as per your any requirements.
3 The 3-fragment full range toe-guard can prevent the operator from entering into the dock leveler by accident and prevent any damage and casualty to the operator.
4 Operation process: Push "UP" button, platform begin to rise. When it rise to highest point, push "EXTEND" button, lip extend out. Then press "DOWN" button, platform and lip lower down to rest on the truck box bed. When loading&unloading is over, then press "UP" botton, platform and lip begin to rise. When platform and lip get away from the truck box bed, then press "RETRACTION" button, lip retract. The push "DOWN" button, then dock leveler restore to original stored position.
5 Two laminated rubber bumper with woven fiber inside can withstand any shock between the truck and dock.
6 Meets all possible user demand and comply with rules and regulations of European EN1398 standards.
 
 CE Approved 10 Ton Airbag Dock Leveler For Loading / Unloading Cargo 0
 
Specifications:

 

Model Specification(W*L*H)mm Pit Dimension(W*L*H)mm Adjust range Lip board(W*L*T)
6*6 1830*1830*490 1870*1680*500 +300mm/-300mm 1830*400*15
6.5*6 1980*1830*490 2020*1680*500 1980*400*15
7*6 2130*1830*490 2170*1680*500 2130*400*15
6*8 1830*2440*490(590) 1870*2280*500(600) 1830*400*15
6.5*8 1980*2440*490(590) 2020*2280*500(600) 1980*400*15
7*8 2130*2440*490(590) 2170*2280*500(600) 2130*400*15
6*10 1830*3050*490(590) 1870*2880*500(600) +400mm/-300mm
If the height is 590mm:
+450mm/-350mm
1830*400*15
6.5*10 1980*3050*490(590) 2020*2880*500(600) 1980*400*15
7*10 2130*3050*490(590) 2170*2880*500(600)

2130*400*15

 

 

Air bag bracket pictures:

CE Approved 10 Ton Airbag Dock Leveler For Loading / Unloading Cargo 1

 

CE Approved 10 Ton Airbag Dock Leveler For Loading / Unloading Cargo 2

 

استعلام خود را ارسال کنید
لطفا درخواست خود را به ما بفرستید و ما در اسرع وقت به شما پاسخ خواهیم داد.
بفرست